The defense of final qualifying works took place at the Department of Construction KRSU.
Projects submitted included architectural and design solutions for heating, gas supply and ventilation systems of populated areas, residential buildings, industrial enterprises, public buildings or their complexes that correspond to the current level of development of construction science and technology.
The topics of the work were varied: heating and ventilation of buildings for various purposes, including work on modernizing these systems, research devoted to improving the heat-protective qualities of heat supply and ventilation systems for individual houses, gas supply to settlements of various populations, etc.
In total, the commission reviewed 15 theses. All students demonstrated a high level of theoretical and practical training in the field of heating, ventilation and gas supply to populated areas, residential buildings, and various facilities. When performing final qualifying work, students used software and design tools.
The Commission specifically noted several projects: «Heating and ventilation of the administrative and domestic building of the frozen food plant “Shin-Line” in the village. Alamedin, Alamedinsky district» (author – D. Tretyakov, who made a detailed thermal calculation of the enclosing structures, which made it possible to fully assess the energy consumption of the building and, accordingly, achieve a more accurate understanding of the efficiency of the heating and ventilation system), «Heating and ventilation of an apartment building on Abdurakhmanova Street in Bishkek» (author – A. Sarybagysheva – noted the advantage of apartment heating) «Gas supply to a residential area “New building” in the city of Shopokov» (the author, M. Daniyarova, focused on one of the most important social tasks of the state – urban gasification), «Design of a nine-story frame-monolithic residential building on Kurchatova Street in Bishkek» (interdisciplinary project).